Journal Paper

Journal Paper
39. “What quantitative indicators do construction companies use to manage ESG? – A case study in South Korea.” LINK
Seo, W., Kim, M., and Kang, Y.* (2024). (in Korean) Journal of the Architectural Institute of Korea., 40(7), 239–249.
38. “Measuring Habituation to Auditory Warnings Using Behavioral and Physiological Data.” LINK
Chae, J., Hwang, S., and Kang, Y* (2024). ASCE Journal of Construction Engineering and Management, 150(7), 04024063.
37. “Identifying Key Financial Variables Predicting the Financial Performance of Construction Companies.” LINK
Seo, W., Kim, B., Bang, S., and Kang, Y* (2024). ASCE Journal of Construction Engineering and Management, 150(3), 04024007.
36. "Job Training and Safety Education for Modular Construction using Virtual Reality" LINK
Choi, H., Chae, J., and Kang, Y.* (2023). Korean Journal of Construction Engineering and Management, 24(5), 063-072.
35. "Social Acceptability of Modular Construction through the Case Study of Education Facilities" LINK
Seo, W., Lee, I., and Kang, Y.* (2023). Journal of the Architectural Institute of Korea, 39(8), 255-266.
34. “Distribution of Occupational Safety and Health Management Costs (OSHMC) by Project Size and Activity Type with the Consideration of Accident Rates” LINK
Jeong, H., Chae, J., and Kang, Y.* (2023). Korean Journal of Construction Engineering and Management, 24(4), 044-051.
33. “Architects’ Perception and Required Competencies for the Implementation of Design for Safety (DfS)” LINK
Seo, W., Cha, Y., and Kang, Y.* (2023). Journal of the Architectural Institute of Korea, 39(6), 253-263.
32. “Differences in Worker’s Safety Behavior Depending on the Project Size and Risk Level of Work Based on Multi-Group Analysis.” LINK
Jung, H., Seo, W., and Kang, Y* (2023). ASCE Journal of Construction Engineering and Management, 149(5), 04023028.
31. “Long-term Trends in Construction Engineering and Management Research in Korea.” LINK
Kang, S., Kang, Y., and Kim, S*. (2023). KSCE Journal of Civil Engineering, 27, 1883-1897
30.“Curtain Wall Construction: Issues and Different Perspectives among Project Stakeholders”LINK
Eom, J. and Kang, Y* (2022), ASCE Journal of Management in Engineering , 38(5), 04022054.
29.“A Survey of Perception Differences Among University Students, Professors, and Practitioners on the Construction Technologies in the Fourth Industrial Revolution” LINK
Kim, T., Park, S., Choi, B., Kang, Y., Park, K., Jeong, W., and Koo, C.* (2022), Korean Journal of Construction Engineering and Management, 23(3), 095-103.
28.“Calculating the Cost Impact in Loss of Productivity Claims” LINK
Seo, W., Kim, J., and Kang, Y* (2022), Automation in Construction, 140, 104341.
27.“Temporal Analysis of the Frequency of Accidents Associated with Construction Equipment”LINK
Jung, H., Choi, B., Kang, S., and Kang, Y* (2022), Safety Science, 153, 105817.
26.“How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects?”LINK
Jeon, M. and Kang, Y.* (2021), Korean Journal of Construction Engineering and Management, 22(6), 044-054.
25.“Affinity Analysis Between Factors of Fatal Occupational Accidents in Construction Using Data Mining Techniques”LINK
Lim, J., Han, S., Kang, Y., and Kang, S.* (2021), Korean Journal of Construction Engineering and Management, 22(5), 029-038.
24.“Relationship between Consistency and Performance in the Claim Management Process for Construction Projects”LINK
Seo, W., Kwak, Y. and Kang, Y.* (2021), ASCE Journal of Management in Engineering, 37(6), 04021068.
23.“Relationship between rework of engineering drawing tasks and stress level measured from physiological signals”LINK
Chae, J., Hwang, S., Seo, W., and Kang, Y.* (2021), Automation in Construction, Vol.124, 103560.
22.“Effectiveness of VR crane training with head-mounted display: Double mediation of presence and perceived usefulness”LINK
Song, H., Kim, T., Kim, J., Ahn, D., and Kang, Y.* (2021), Automation in Construction, Vol.122, 103506.
21.“Performance Indicators for the Claim Management of General Contractors.”LINK
Seo, W., and Kang, Y.* (2020), ASCE Journal of Management in Engineering, 36(6), 04020070.
20.“Inter- and Intra-Organizational Safety Management Practice Differences.”LINK
Choe, S., Seo, W., and Kang, Y.* (2020), Safety Science, Vol.128, 104778
19.“Quantifying the Effectiveness of IoT Technologies for Accident Prevention.”LINK
Yeo, C.J., Yu, J.H., and Kang, Y.* (2020), ASCE Journal of Management in Engineering, 36(5), 04020054
18. "Evaluating contractors’ production performance in highway projects using historical daily work report data." LINK
Le, C., Jeong, H.D., Le, T., and Kang, Y.* (2020), ASCE Journal of Management in Engineering, 36(3), 04020015.
17. "Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract." LINK
Jang, S., Jeong, Y., Lee, G., and Kang, Y.* (2019), ASCE Journal of Management in Engineering, 35(6), 04019022.
16. “Use of Fall Protection in the U.S. Construction Industry.” LINK
Kang, Y.* (2018), ASCE Journal of Management in Engineering, 34(6), 04018045.
15. “Construction Management Functions for Developing Countries: Case of Cambodia.” LINK
Kang, Y.*, Jin, Z., Hyun, C., Park, H. (2018), ASCE Journal of Management in Engineering, 34(3), 05018004.
14. “Trends of Fall Accidents in the U.S. Construction Industry.” LINK
Kang, Y.*, Siddiqui, S., Suk, S., Chi, S., Kim, C. (2017), ASCE Journal of Construction Engineering and Management, 143(8), 04017043.
13. “Measuring Project Management Inputs throughout Capital Project Delivery.” LINK
Yuns, S., Choi, J., Oliveira, D., Mulva, S., Kang, Y.* (2016), International Journal of Project Management. 34(7), 1167-1182.
12. “Critical Look into the Relationship between Information and Communication Technology (ICT) and Integrated Project Delivery (IPD) in Public Sector Construction.” LINK
Azhar, N., Kang, Y.*, and Ahmad, I. (2015), ASCE Journal of Management in Engineering. 31(5), 04014091.
11. “Information Integration Maturity Model for the Capital Projects Industry.” LINK
Kang, Y.*, O’Brien, W., and O’Connor, J. (2015), ASCE Journal of Management in Engineering., 31(4), 04014061.
10. “Prediction of government-owned building energy consumption based on an RReliefF and support vector machine model.” LINK
Son, H., Kim, C., Kim, C., and Kang, Y. (2015), Journal of Civil Engineering and Management, 21(6), 748-760.
9. “Pullout of Geogrid Reinforcement with In-Plane Drainage Capacity in Cohesive Soil.” LINK
Kang, Y., BooHyun Nam, Jorge G. Zornberg, and Yoon-Ho Cho. (2015), KSCE Journal of Civil Engineering, 19(3), 602-610.
8. “Classification of Major Construction Materials in Construction Environments Using Ensemble Classifiers.” LINK
Son, H., Kim, C., Kim, C., Hwang, N., and Kang, Y. (2014), Advanced Engineering Informatics, 28 (1), 1-10.
7. “Comparison of Preproject Planning for Green and Conventional Buildings.” LINK
Kang, Y., Kim, C., Son, H., Lee, S., and Limsawasd, C. (2013), ASCE Journal of Construction Engineering and Management, 139 (11), 04013018.
6. “Value of IT: Indirect Impact of IT on Construction Project Performance via Best Practice.” LINK
Kang, Y., O’Brien, W., and Mulva, S. (2013), Automation in Construction, 35, 383-396.
5. “Interaction effects of information technologies and best practices on construction project performance.” LINK
Kang, Y., O’Brien, W., Dai, J., Mulva, S., Thomas, S., Chapman, R.E., and Butry, D. (2013), ASCE Journal of Construction Engineering and Management, 139 (4), 361-371.
4. “IOP Tool: Assessing the Benefits and Hindrances of Information Integration Opportunities.” LINK
Kang, Y., O’Brien, W., and O’Connor, J. (2012), ASCE Journal of Management in Engineering, 28(2), 160-169.
3. “Analysis of Information Integration Benefit Drivers and Implementation Hindrances.” LINK
Kang, Y., O’Brien, W., and O’Connor, J. (2012), Automation in Construction, 22, 277-289.
2. "Development of a data mining-based analysis framework for multi-attribute construction project information." LINK
Chi, S., Suk, S., and Kang, Y., and Mulva, S.P. (2012), Advanced Engineering Informatics, 26(3), 574-581.
1. "Impact of information technologies on performance: Cross study comparison." LINK
Kang, Y., O’Brien, W., Thomas, S., and Chapman, R.E. (2008), ASCE Journal of Construction Engineering and Management, 134(11), 852-863.
*Corresponding Author